Each batch includes:

Traceable products
Marking in casting process.

Material certificate

Testing of every batch before delivery
Inspection release note.

FAT if required

Testing of materials and function:

Corrosion testing
In seawater.

Torque testing
Bolts to maximum torque.

Corrosion test.
The clamps are exposed to sea water twice a day due to the tide.
The test was done over a period of 12mnd.

Among our clients are